600 m² + 327 m²
Grit Waste Storage (Concrete + Steel)
Drainage Channel Revisions
Workshop & Yard Utilities
Quay & Workshop Facilities
Operational Yard Grading
Heavy Transfer Runway
Heavy Block Trolley Runways
Project Details
Operating in the Yalova Altınova Shipyards Zone, Park Tersanesi infrastructure, superstructure, and facility modernization works were executed to elevate heavy industrial standards and operational efficiency. Primary works completed include:
- Grit Waste Facility Construction: Construction of a 327 m² structural steel superstructure upon a 600 m² heavy reinforced concrete foundation slab for dedicated industrial grit waste containment.
- Electrical & Maintenance Workshop Utilities: Execution and modernization of specialized reinforced underground utility trenches and channels within and around the Electrical & Maintenance Workshops.
- Shipyard Utility & Drainage Modernization: Comprehensive overhaul and modernization of general shipyard underground utility ducts, cable galleries, and stormwater drainage networks.
- Quay & Workshop Facility Enhancements: Heavy-duty civil paving and operational site grading across heavy shipbuilding quays and primary fabrication workshops.
- Heavy Block Trolley Runways: High-load reinforced concrete block transfer trolley tracks engineered for the safe transport of mega vessel hull sections.
Project Gallery
Get a Quote & Info
EK
Ekovit Engineering Assistant
Online — Engineering Consultant
Hello! 👋 Welcome to Ekovit’s Engineering Advisor. How can we help with your project?
